Food Service and Restaurant construction requires a specialized understanding of food service equipment, the connections that are required for each piece of equipment and its functionality.  Our teams have experience in design creation and the construction of multiple restaurants or food service type venues.  We have experience  working within a Cafeteria setting inside of a Hospital in the past, or building a new restaurant with the addition of a Grease Interceptor and Sewer Line.  When it comes to Food Service, our experience adds value to our client’s project.

The Sporty Pickle

Project Characteristics

  • Design Build Construction
  • Industrial/Retail Environment
  • Sports Courts
  • High End Restaurant and Bar Finishes
  • Commercial Kitchen
  • Advanced Lighting Control Systems
  • Site Utility Upgrades
  • Site Safety and Worker Safety

Project Summary

Gordon Investments chose Select to complete a design to build a pickleball restaurant/bar. Select teamed with MOA Architecture to create this unique restaurant and pickleball experience. The restaurant/bar includes 60 feet of wrap-around bar with an open dining area where you can view TVs from any seat in the house. The pickleball area includes three sports courts with event style lighting. The commercial kitchen build-out includes 5,000sf of space that was connected to a new grease trap (exterior) and tied into the city sewer.  This facility was originally intended for warehouse companies with low utility requirements. Converting this facility to a restaurant included upgrades to site utilities, including a 2” water service, gas line upgrades, and coordination with XCEL energy to relocate main building electrical lines that conflicted with sewer routing. This project was a huge success for a repeat client.

DEN – HALFMOON EMPANADA (CONCOURSE B)

Project Characteristics

  • DEN Concessions
  • ICRA Containments and Dust Control
  • Airport Environment
  • Life Safety Systems
  • Public Safety

Project Summary

Select teamed with Emerging Airport Partners and Halfmoon Empanada to complete the design assistance and construction of this food service kiosk space in Concourse B at DEN. This project included coordination, escorting, and delivery of owner provided millwork kiosks and food service installations. The escort included tarmac and back of house delivery to the project location within Concourse B. The team coordinated the installation of MEP systems for owner-provided food service equipment and provided supervision and management for the project to successfully complete the grand opening at DEN.

Restaurant and Bar Renovation (Coors Field)

Project Characteristics

  • Sporting Venue and Stadium Environment
  • High End Restaurant and Bar Finishes
  • Stadium Deliveries and Logistical Coordination
  • Food Service Equipment
  • Preparation for Owner’s Custom Artist Consultant
  • Site Safety and Worker Safety

Project Summary

Select completed the renovation of this interior restaurant and bar at Coors Field. This project included the demolition and replacement of restaurant finishes, a new front of the bar counter, reused food service equipment, back of bar millwork, LED lighting and shelving, custom graphics package, and coordination of audio visual systems. The remainder of the project included the renovation of two existing restroom groups and the replacement of corridor finishes that lead to stadium seating behind home plate. This project was completed during the 2023-2024 offseason. Select worked with the Rockies organization to establish accurate durations and timelines to ensure the project was completed within the off-season to be ready for opening day.

Bucaroos Concession (Coors Field)

Project Characteristics

  • Sporting Venue and Stadium Environment
  • Renovation of Existing Finishes
  • Stadium Deliveries and Logistical Coordination
  • Commercial Kitchen and Food Service Equipment
  • Preparation for Owner’s Custom Artist Consultant
  • Site Safety and Worker Safety

Project Summary

Select completed the renovation of this exterior stand-alone concession building at Coors Field. Scope of work included interior demolition, steel, roofing, new finishes, and an MEP refresh. These concession remodels were completed during the 2023-2024 offseason. Select worked with the Colorado Rockies organization to establish accurate durations and timelines to ensure the project was completed within the off-season to be ready for opening day.

Hospital Cafeteria Grease Duct Replacement (Presbyterian Saint Luke)

Project Characteristics

  • Hospital Environment
  • ICRA
  • Dust Control
  • Exterior Building Grease Shaft Addition
  • Scaffolding Systems
  • Roof Protection and Repairs
  • Condensed Area
  • Site Safety and Worker Safety

Project Summary

Select was awarded this interior and exterior renovation at Presbyterian Saint Luke Hospital, which included multiple sections of the facility needing protection and containment during the renovation process. Construction included demolition and rerouting of existing employee cafeteria grease duct. The rerouting process included taking existing duct that was fed to outside face of building and relocating to roof top exhaust. Select completed this project while the facility remained opened. ICRA containments provided hospital workers a safe environment to continue the operations of the cafeteria. The final stages of the project included replacement of interior finishes prior to the cafeteria reopening its full operations.